Why This Scope Was Recommended
The documented sequence was: existing roofing removed → decking inspected → new underlayment installed → ventilation improvement → architectural shingles installed. New underlayment was installed as part of the replacement scope after the deck was inspected, and ridge ventilation was improved as part of the project — showing the replacement scope considered another part of the roofing system rather than focusing only on the visible roof covering. Flashing details were also part of the documented roofing scope, alongside the tear-off, upgraded underlayment and ridge ventilation work, though the exact flashing locations involved have not been publicly specified.
Materials / Components Used
- 1New underlayment
- 2Improved ridge ventilation
- 3Flashing details (locations not publicly specified)
- 4Premium architectural shingles